- Johnson Controls
- Security Systems & Solutions
- Access Control
- Integrated Solutions
Integrated Solutions
Intelligent, Scalable and Integrated Solutions for Security and Business Applications
Intelligent
Flexible
Convenient
Video Solutions
View critical situations in real time and significantly increase emergency response
- Display video views, video tours, perform PTZ controls and trigger alarms and events or camera actions when an alarm is triggered
- Seamlessly Integrates with security and event monitoring systems
- Scalable for long-term investment
- View recorded video clips from PACS monitoring station
Please contact us to learn more
Intrusion Detection
Monitor and perform intrusion detection within a facility to stop incidents of malicious activity or policy violations
- Central alarm monitoring for fast response times
- Immediately notify security personnel when suspicious activity occurs
- Monitor panel status and arm/disarm partitions from one central location
Please contact us to learn more
Fire Alarm Management
Instantly provide visibility of the nature and location of fire and other emergencies
- View critical security and fire events in one interface
- Easily view representation of points, zones, and panels on graphical maps
- Store fire alarm activity for future investigative reporting
Please contact us to learn more
License/Number Plate Recognition
Makes vehicle identification easier and eliminates unauthorized access to the facility.
- INEX/ZAMIR ALPR Camera
- Reports by plate, date, and time
- Customizable alerts for flagged or blacklisted plates
Please contact us to learn more
Mobile Access
Access to secured doors through a mobile device improves user convenience and operational efficiency.
- AES protection for mobile IDs
- “Tap” or “Twist and Go” door opening options
- Bluetooth Low Energy (BLE) or Near Field Communication (NFC)
Please contact us to learn more
Personnel and Visitor Management
Powerful management tools managing personnel and visitors in C•CURE.
- Helps pre-register visitors, individuals or groups
- QR codes used for convenient check-ins
- Data can be stored for as long as needed
Please contact us to learn more
Perimeter Detection
Notifies, monitors, acknowledges and cancels alarms via AC2000 access control system.
- Real-time activity viewed directly from application
- Video alarm pop-up features available in the application
- FFT CAMS perimeter defence alarms and events incorporated
Please contact us to learn more
Physical Security Information Management
A comprehensive user interface tying disparate systems into one platform.
- Each alarm follows an operating procedure
- Provides real time situation detection
- Both input and output communication available
Please contact us to learn more
Real-time Location System
Allows users to track personnel and valuable assets in real-time through C•CURE 9000.
- Associates video with events based on location
- Enhances security of assets and safety of people
- Creates and exports sophisticated reports
Please contact us to learn more
Security Wearables
Enforces access control visitor policies in order to provide visual security awareness.
- Visually demonstrates authorized presence
- Reduces risks by ensuring access control compliance
- Delivers a unique visitor management solution
Please contact us to learn more
Standard Interface Communication
Integrates third party devices with C•CURE 9000.
- Provides standard interface communication
- Uses ASCII code for communications protocol for event monitoring
- Interprets messages for C•CURE 9000 from third party devices
Please contact us to learn more






















.jpg?la=en&h=320&w=720&hash=244C75B74F0F77521D56164450973BCD)














.jpg?la=en&h=310&w=720&hash=8D9823F26AA80B2B75C3E4B2E61770DC)


.jpg?la=en&h=320&w=719&hash=13CA7E4AA3E453809B6726B561F2F4DD)
.jpg?la=en&h=306&w=720&hash=F21A7CD3C49EFBF4D41F00691D09AEAC)

.png?la=en&h=320&w=720&hash=18CFCCD916C92D922F600511FABD775D)





